04.6 · ENERGY UPGRADES
CAPABILITY 06 · ENERGY & SUSTAINABILITY UPGRADES
Energy & sustainability upgrades.
Retrofit works for existing buildings: insulation, HVAC-related builders' works, water-efficiency measures and upgrade packages that reduce operating cost.
Efficiency expressed in the owner's numbers, not adjectives.
04.6.1 · THE SCOPE
Upgrades as construction packages.
Each upgrade is a defined works package — insulation, builders' works supporting HVAC replacement, water-efficiency measures — scoped, procured and executed with the same engineering review and site discipline as any other NAMAH scope.
What the package covers.
01
Insulation upgrades
Roof, wall and soffit insulation improved as a defined works package, with the existing build-up opened up and confirmed before the specification is fixed.
02
HVAC builders’ works
Plinths, penetrations, access and making good around a plant replacement, sequenced so the mechanical contractor is never standing in front of a wall waiting for it to move.
03
Water-efficiency measures
Fittings, controls and distribution altered where the building allows it. Flow rates are specified from product data and recorded, so the change can be checked afterwards by somebody other than us.
04
Lighting replacement
Luminaires, controls and emergency provision replaced together. A lighting upgrade that leaves the switching alone returns a fraction of what the lamps were specified to give.
05
Envelope repair & sealing
Joints, seals, thresholds and abutments repaired so the fabric performs the way the plant already assumes it does. Air leakage is a construction defect before it is an energy cost.
06
Measurement & verification
Meters, logging points and the baseline method agreed before the works begin. Without a baseline there is no saving — there is only a number.
04.6.2 · THE WHOLE-LIFE DECISION
The decision inside this scope.
The case for a retrofit is written in the owner's numbers: energy and water measured against target, waste controlled during the works, and the specifications recorded so the saving can be verified in operation — not asserted in a brochure.
Principles applied
- Measured against target
- Energy and water, during the works and at commissioning.
- Controlled during execution
- Waste tracked and managed while the works are on site.
- Recorded for operation
- Specifications kept, so the saving can be verified afterwards.
04.6.3 · DELIVERY & RECORD
Measured during the works. Recorded at handover.
Resource and waste tracking during execution; energy and water specifications, testing and commissioning evidence assembled into the Green Project Pack the owner keeps.
Scope a retrofit package.
Tell us the building, the operating problem and the constraint. Enquiries are answered within two working days.
Enquiries answered within two working days.